MCZ Club Manuel d'instructions Page 30

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 65
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 29
PELLET STOVES Chapter 3
INSTALLATION AND USE MANUAL
page 30
Installation and assembly Technical service - Rights reserved MCZ Group S.p.A. - Reproduction prohibited
3.4.6. Assembling the frontal/side panel and top on the Toba stove
The Toba stove has three parts requiring assembly:
o Front panel in:
Ceramic
Steatite
o Sides made of steel
o Top
The front panel
made in ceramics
is delivered with the ceramics
secureed onto the iron frame, therefore it is sufficient to secure it onto
the stove structure using the two upper screws and the two lower
screwsi (P).
Whereas the front panel made
in steatite
has to be assembled. The
steatite tiles shall be delivered on a pallet while the iron frame of the
panel shall be on the pallet with the stove.
Tiles M-N have to be unpacked, lay the panel frame horizontally and
position the tiles following correspondence of the holes on the frame
with the threaded inserts for secureing with the supplied screws. Once
the steatite tiles have been secureed, proceed with secureing the panel
to the structure as for the panel with ceramic tiles.
MN
MN
IN FRONT
BEHIND
P
P
P
P
P
P
P
P
The steel side panels are secureed to the structure of the stove by
sliding the apposite plugs A-B found on the lower part of the panels
into the holes (a) found on the base of the stove. Once in position
secure the side panel onto to upper part of the stove using the two
screws (b-c).
Vue de la page 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 64 65

Commentaires sur ces manuels

Pas de commentaire